First in Siberia: Polymer Production Using Proprietary Raw Materials
Timeline: 2014 — present day
The Manufacturing Plant will become part of a large-scale gas chemical cluster, integrating enterprises involved in the extraction, preparation, transportation, and processing of gas into high-value-added products. The production capacity is 650,000 tons per year.

The enterprise will operate according to the most stringent environmental standards. A closed-loop water cycle has been implemented here—water undergoes purification and is reused without discharge into water bodies. Environmental monitoring of water, air, soil, and biodiversity will be conducted continuously, both in the central laboratory and using a mobile analytical complex. The gas emission control system will operate around the clock.

Parallel to the plant's construction, a residential micro-district with full infrastructure is also being created—just 20 minutes from the production site. The new district is designed for 3,000 residents, including plant employees and their families.
© 2024 RECLAB
All rights reserved.
+7 (916) 133 63 64
info@reclab.pro
Varshavskoye Shosse, 1, Bldg. 17, 4th Floor
Address
Contact Us
Business Center W Plaza 2, Moscow, 117105
Ochakovskoye Shosse, 28, Bldg. 2
PO Box
Suite 8H/3, Moscow, 119530
+7 (903) 236 75 05